Fiji · Off-Grid Microgrid Project

Fiji 1.7 MWp PV with 1.5 MW / 2.98 MWh energy storage
项目名称
Fiji · Off-Grid Microgrid Project
项目地址
Fiji
项目类型
Off-Grid Microgrid Project
并网时间
2025
总装机容量
1.7 MWp PV with 1.5 MW / 2.98 MWh energy storage

Before the construction of this PV-ESS plant, the factory relied solely on diesel generators for power. After two years of low-load operation, the generators began experiencing issues, including carbon buildup, oil burning, and corrosive aging, leading to a significant decline in power generation efficiency. The factory operates for 10 hours daily, from 8:00 AM to 8:00 PM, with an average load of 500 kW and a peak power demand of 1,100 kW. The new PV-ESS plant will largely replace the diesel generators, utilizing solar power during the day and stored energy at night. 